Viking Built-In Convection Microwave Hood Instalační příručka

Procházejte online nebo si stáhněte Instalační příručka pro Pece Viking Built-In Convection Microwave Hood. Viking Built-In Convection Microwave Hood Installation guide Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 8
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
Mounting Space
This Convection Microwave Hood requires a mounting
space on a wall as shown in figure 1. It is designed to
be used with standard 12-inch wall cabinets.
For proper installation and servicing, a 2-inch space is
necessary between the top of the range backguard and
the bottom of the Convection Microwave Hood.
Wall Construction
This Convection Microwave Hood should be mounted
against and supported by a flat vertical wall. The wall
must be flat for proper installation. If the wall is not flat,
use spacers to fill in the gaps. Wall construction should
be a minimum of 2" x 4" wood studding and 3/8" or more
thick dry wall or plaster/lath. The mounting surfaces must
be capable of supporting a weight of 110 poundsthe
oven and contentsAND the weight of all items which
would normally be stored in the top cabinet above the
unit.
The unit should be attached to a minimum of one 2" x
4" wall stud or two 2" x 3" wall studs.
To find the location of the studs, one of the following
methods may be used:
Use a stud finder, a magnetic device which locates the •
nails in the stud.
Use a hammer to tap lightly across the mounting •
surface to find a solid sound. This will indicate stud
location.
The center of the stud can be located by probing the
wall with a small nail to nd the edges of the stud and
then placing a mark halfway between the edges. The
center of any adjacent studs will normally be 16" or 24"
to either side of this mark.
Viking Installation Guide
Convection Microwave Hood
111 Front Street
Greenwood, Mississippi 38930 USA
IMPORTANTPlease Read and Follow!
Please read all instructions thoroughly before installing the Convection Microwave Hood. Two people are •
recommended to install this product.
If a new electrical outlet is required, its installation should be completed by a qualified electrician before the •
Convection Microwave Hood is installed. See 3 ELECTRICAL GROUNDING INSTRUCTIONS on page 2.
Backguard
At least 2"
15.5"
30"
12"
30" or more
from cooking
surface
66" or more
from floor
1
Zobrazit stránku 0
1 2 3 4 5 6 7 8

Shrnutí obsahu

Strany 1 - Convection Microwave Hood

Mounting SpaceThis Convection Microwave Hood requires a mounting space on a wall as shown in figure 1. It is designed to be used with standard 12-inch

Strany 2 - Hood Exhaust Duct

E2When the hood is vented to the outside, a hood exhaust duct is required. All ductwork must be metal; absolutely do not use plastic duct. Check that

Strany 3 - Installation Hardware

E3Phillips Screwdriver •Electric Drill •½",• ⁵⁄₈" and ³⁄₃₂" Drill Bits1½" Wood Bit or Metal Hole Cutter •(if meta

Strany 4 - Ductless Operation

E4Ventilation System (Preparing Oven for Installation)This Convection Microwave Hood is designed for adaptation to three types of hood ventilati

Strany 5

E5Ventilation System (Preparing Oven for Installation)HORIZONTAL EXHAUST: Replace the fan cover bracket. Make sure the fan blades are visible t

Strany 6 - Oven Installation

E6Oven InstallationTHIS OVEN CANNOT BE PROPERLY INSTALLED WITHOUT REFERRING TO THE MOUNTING INSTRUCTIONS FOUND ON WALL AND TOP CABINET TEMPLATES.M

Strany 7

E7Oven Installation(A)(B)(B)(C)(D)figurefigurefigurefigurefigurefigurefigurefigurefigurefigurefigurefigurefigurefigurefigurefigurefigurefigurefigurefi

Strany 8 - Checklist for Installation

E8Checklist for InstallationMake sure the unit has been installed according to all of •the Installation Instructions and the Wall and T

Komentáře k této Příručce

Žádné komentáře